Case Study: Successful Commissioning of a PNG Burner in a 6,00,000 Kcal/Hr Thermic Fluid Heater in Maharashtra

Client: Reputable Boiler and Thermic Fluid Heater Manufacturer
Location: Industrial Manufacturing Facility – Maharashtra
Industry: Manufacturing
Application: 6,00,000 Kcal/Hr. Thermic Fluid Heater
Overview
We are proud to share the successful commissioning of a high-efficiency PNG burner for a thermic fluid heater application. The project involved the installation and commissioning of a 6,00,000 Kcal/hr. PNG burner designed to improve fuel efficiency, optimize heating performance, and ensure reliable operation.
Scope of Work
The scope included:
- Supply and commissioning of a high-efficiency PNG burner
- Integration with the existing thermic fluid heater system
- Gas line connection and safety interlock testing
- High and low flame operation setup
- Combustion tuning and efficiency optimization
- Performance testing and system handover
Key Benefits
- Significant fuel savings compared to the previous imported burner
- Improved combustion efficiency
- Reliable high and low flame burner operation
- Stable thermic fluid heating performance
- Enhanced operational reliability and safety
Client Feedback
“We are highly satisfied with the burner performance and fuel savings achieved after commissioning. Compared to the previous imported burner, the new PNG burner delivers better efficiency and reliable operation.”
Conclusion
This successful project demonstrates the expertise of Oxilon Burners in delivering advanced and energy-efficient combustion solutions for industrial heating applications. The installation highlights our commitment to performance, fuel efficiency, and customer satisfaction through reliable burner technology.