Case Study: Steam Boiler – 10 TPH – FO

Successful Burner Installation at Vapi
We are proud to share the successful completion of a burner installation at Vapi located in Gujarat. This involved the installation of a high-efficiency FO (Furnace Oil) burner on a Steam Boiler, aimed at improving energy performance, reducing emissions, and ensuring operational safety.
Overview
Location: Chemical Company - Vapi GIDC
Installation Date: 01, 2023
Burner Type: HMD 3755 SH and Furnace Oil
Application: 10 TPH Horizontal Steam Boiler
Scope of Work
The scope included:
- Removal of the existing burner system
- Supply and installation of a new HMD 3755 SH with full control integration
- Fuel line setup and safety interlock testing
- Combustion tuning and efficiency optimization
- Operator training and system handover
Client Feedback
“The installation was seamless and professionally executed. The new burner has significantly improved our operational reliability and reduced our fuel costs.”