Successful Burner Installation at Vapi

We are proud to share the successful completion of a burner installation at Vapi located in Gujarat. This involved the installation of a high-efficiency FO (Furnace Oil) burner on a Steam Boiler, aimed at improving energy performance, reducing emissions, and ensuring operational safety.

Overview

Location: Chemical Company - Vapi GIDC

Installation Date: 01, 2023

Burner Type: HMD 3755 SH and Furnace Oil

Application: 10 TPH Horizontal Steam Boiler

Scope of Work

The scope included:

  • Removal of the existing burner system
  • Supply and installation of a new HMD 3755 SH with full control integration
  • Fuel line setup and safety interlock testing
  • Combustion tuning and efficiency optimization
  • Operator training and system handover

Client Feedback

“The installation was seamless and professionally executed. The new burner has significantly improved our operational reliability and reduced our fuel costs.”